Construction Case

Site leveling and civil engineering project of Douala Industrial Park

  • Release time: 2025-12-08

Client background: The client is Douala Special Economic Zone Development Company, responsible for land development in large industrial parks and attracting foreign-funded enterprises to settle in.
Pain points of demand: The terrain of the site is undulating and the soil is soft, requiring large-scale leveling and compaction; Adjacent to the coast, with high groundwater levels, construction is easily affected by humid environments, resulting in enormous project pressure.
Solution: CMCC utilizes advanced engineering machinery to carry out earthwork excavation, backfilling, and layered compaction, combined with professional drainage system design and civil blasting assisted rock treatment. The entire process is supervised by the China Kazakhstan joint technical team to ensure that the site leveling and bearing capacity meet international industrial standards.
Project achievements: The site leveling area has reached 150000 square meters, the construction period has been shortened by 30%, providing conditions for enterprises in the park to settle in early, significantly improving the land use value, and highly recognized by the owners.

 

杜阿拉工业园区场地平整土建工程

 

Selected from the company's earthwork excavation and heavy-duty dump truck transportation scenarios

url: https://cn.meilan-cmcc.com/en/1052/27.html

Address:

CMCC Bastos,Yaoundé,Cameroun 
CMCC-SMC Dibamba,Douala,Cameroun

Telephone:

00237-670132222
00237-651463333
00237-679178888

Email:zhouxiaobo@237cmcc.com

Copyright © 2023-2043 CAMEROON MEILAN CONSTRUCTION CONGLOMERATE SARL

online service

Hello, I am the online customer service

X